Prevention and Solutions of Concrete Cracks in Cast-in-Place Box Girder
DOI: https://doi.org/10.62517/jcte.202406311
Author(s)
Chuan Xue
Affiliation(s)
Chongqing Tongnan District Transportation Affairs Center, Chongqing, China
Abstract
Cracks in cast-in-place box girder concrete are a complex problem, with various causes and treatment methods, mainly involving multiple aspects such as materials, construction, and design. The formation of cracks can be attributed to two types of internal and external factors. Internal factors include material shrinkage deformation, temperature changes, and construction processes, while external factors include load effects, moisture infiltration, and earthquakes. In order to effectively control and deal with these cracks, comprehensive treatment from multiple perspectives is needed. This article examines ways to enhance the accuracy of predicting concrete crack formation by analyzing the influencing factors. During construction and maintenance, a series of measures are implemented to control the onset and progression of concrete cracks. Additionally, the article discusses ways to strengthen communication and collaboration in engineering practices, and to advance the application of concrete crack control technology. Finally, the article underscores the importance of strengthening quality control and supervision mechanisms to ensure the correct implementation of control measures and the validation of their effectiveness. These findings are crucial for improving the longevity and durability of bridge structures.
Keywords
Cast in Place Box Girder; Concrete Cracks; Preventive Measures; Solution Measures; Traffic Engineering
References
[1] Wei Lei, Wang Xianbin. Control of cracks in cast-in-place concrete in bridge structure design. Heilongjiang Transportation Science and Technology, 2017 (1): 2.
[2] Qiu Xintao, Li Feng. Control of cracks in cast-in-place concrete in bridge structure design. Traffic World, 2017 (26): 2.
[3] Zeng Hansen. Control of Cracks in Cast-in-place Concrete in Bridge Structure Design. Urban Construction Theory Research: Electronic Version, 2019 (3): 1.
[4] Lin Ziqiang, Lu Yong. Study on the Tendon Tensioning Scheme for the Web of Cast-in-situ Prestressed Concrete Box Girder Bridges. Western Transportation Technology, 2020(04):43-45.
[5] Wang Leigang, Zhang Tao. Research on Roof Waterproofing Construction Technology in Building Construction Engineering. Building Construction,2022, 44(7): 120 -122.
[6] Du Yajuan. Construction technology combining rigid waterproofing and flexible waterproofing for building roofs. Sichuan Building Materials, 2021, 47 (2): 141-142.
[7] Zhang Rongxin. Safety and Quality Control in Construction Management of Steel Structure Bridges. Sichuan Building Materials, 2022, 48 (12): 221-222.
[8] Wang Zhenkun. Technical Control of Construction Quality of Expansion Joints in Road and Bridge Engineering. Sichuan Building Materials, 2022, 48 (11): 172-173.
[9] Zeng Yue, Zhu Liming, Yang Zhimu. Application of BIM in the Special Construction Plan for the Steel Box Beam of Maputo Bridge. Highway Transportation Technology, 2018, 35 (S1): 69-74.
[10] Tang Mingchun. Construction Technology of Cast in place Box Beams for Bridge Crossing Projects. Heilongjiang Transportation Science and Technology, 2017, 40 (3): 156-157.