STEMM Institute Press
Science, Technology, Engineering, Management and Medicine
Application Research of Critical Chain Technology in Project Portfolio Schedule Management
DOI: https://doi.org/10.62517/jes.202402110
Author(s)
Juan Zhao*, Yao Xiao
Affiliation(s)
School of Management, Shandong University of Technology, Zibo, Shandong, China *Corresponding Author.
Abstract
The study proposes a schedule optimization management framework for warehouse construction project clusters, driven by the goal of enhancing the efficiency and quality of the engineering delivery process. With the rapid expansion trend in modern enterprises' business activities, warehouse construction projects not only grow rapidly in scale but also increase in complexity, raising the requirements for accurate project management, especially in time planning precision. The cutting-edge project management tool, Critical Chain Method, has demonstrated significant advantages in managing uncertainty factors and resolving resource allocation conflicts in multi-project parallel processing. By implementing the Critical Chain Method in a warehouse construction project of an enterprise in Shandong Province, this study observed a significant reduction in the actual completion cycle compared to the scheduled plan. This not only improved the likelihood of completing the project on schedule but also effectively reduced both total time limit and cost. The results validate that the proposed schedule optimization strategy is scientifically sound and effective in practical project management.
Keywords
Project Management; Critical Chain; Project Buffering; Schedule Optimization Management; Schedule Control
References
[1]Liu Yongqiang, Sun Haocong, Zhu Bin, Yang Zhi-shuai. The application of improved critical chain technique in the progress control of pump station construction. China Rural Water and Hydropower, 2024, 1-12. [2]Du Jianfeng. Application of key chain technology in production schedule management of prefabricated building components. Dwelling, 2020(34):35-36. [3]Li Min, Yao Zekun, Liu Renjing,Xu Qingchuan. Review of Multi-project Management Based on Critical Chain Technology. Science and Technology Management Research, 2019, 39(01):205-210. [4]Li Jianguo, Wang Tao. The application of an improved critical chain method in programme schedule management. Project Management Technology, 2023, 21(05):153-159. [5]Ma Guofeng, You jianxin. Quantitative Analysis of Critical Chain Multiple Project Scheduling Management. Systems Engineering-Theory & Practice.2007,(09):64-60. [6]Liao Liang-cai, Zhang Qi. Multi-resource and Multi-project Schedule Optimization Based on a Hybrid Genetic Algorithm and Critical Chain Method. Science Technology and Engineering.2014,14(06):190-195. [7]Gong Jun, Hu Tao, Liu Shengxue. Schedule management method of warships multi-project parallel construction based on critical chain and hybrid optimization algorithm. Systems Engineering and Electronics.2020, 42(08):1784-1793. [8]Bu Zhuzhen, Liang Xiaobei, Meng Hu. Improved Method and Application of Critical Chain ldentification Based on Multi-Project lmportant Degree. Industrial Engineering and Management.2021, 26(5):187-194. [9]Feng Jing-chun, Dong Ling-li. Construction Period-Cost Optimization of Program Based on Critical Chain Method under Multi-Resource Constraints. Chinese Journal of Management Science. 2022, 30(04):132-143. Tao Liyan, Du Haowei, Zhao Pengfei. Research on the Multi-project Schedule Management of the Key-chain Subway. Science and Technology Management Research, 2019, 39 (17):199-204.
Copyright @ 2020-2035 STEMM Institute Press All Rights Reserved