Consideration on the Design of Ship Equipment with Price Limit
DOI: https://doi.org/10.62517/jiem.202503111
Author(s)
Zhuo’er Li1, Juqin Fan2, Guowei Chen1,*, Chuyan Cao1
Affiliation(s)
1Department of Management Engineering and Equipment Economics, Naval University of Engineering, Wuhan, Hubei, China 2Teaching and research support Center, Naval University of Engineering, Wuhan, Hubei, China *Corresponding Author. Zhuo’er Li and Juqin Fan contributed equally to this study.
Abstract
In order to better control the development and building cost of large ship equipment, according to the idea of fixed cost design management method, this paper puts forward the concept of price limit design for large ship equipment development, analyzes the main contents of price limit design work for large ship equipment combined with the tasks in each stage of large ship construction, sets the steps and processes of price limit design work, and sorts out the responsibility system of each research unit. It has an important guiding role in controlling the development cost of large ship, and provides an effective reference for making decisions and measures of the cost management of the whole life cycle.
Keywords
Ship Equipment; Price Limit Design; LCC Management
References
[1]J B Geng, J S Jin. Theory and Practice of Life Cycle Cost Technology. National University of Defense Technology Press, 2015. [2]L Zhou, W F Wang, L Zhang. Equipment Life Cycle Cost Analysis Method and Application. Northwestern Polytechnical University Press, 2024. [3]X D Liu. Equipment Life Cycle Cost Analysis and Control. National Defense Industry Press, 2008. [4]Z Y Wang. Cost Limiting Design in Aeronautical Equipment Development. Aviation Science and Technology, 2017, 28(12):61-64. [5]G W Chen, Y J Zhou L Ren. SD Optimization of Equipment Cost Structure Facing System Performance Maximization. Systems and Engineering and Electronics, 2021, 43(4):1022-1029. [6]G M Zhao, X J Liu. Application Research of Fixed Cost Design Method in USA. Flying Missile, 2012(11):92-96. [7]J Zhang. Analysis on the Fit Between Equipment Development Price Limit Design and Enterprise Target Cost Management. Accountants, 2015(4):69-71. [8]G B Xia, G W Chen, Y D Li, et al. Discussion on The New Era Equipment Price Audit Management. Modern Business Trade Industry, 2024, 45(14):130-133. [9]J S Wang, W Gao, L J Xi. Design and Control of Fixed Cost of Aviation Equipment Based on Life Cycle. Aeronautical Finance and Accounting, 2024, 6(5):45-49. [10]L L Wang. Research on Life Cycle Cost Control of Construction Projects Based on System Dynamics. Guangzhou University, 2017. [11]G W Chen, Z Y Du, Y J Zhou. Analysis on the Construction of Equipment Outlay Use Benefit Evaluation System. Jiangsu Science & Technology Information, 2022, 39(22):69-72.