A Study on Key Issues in the Regulatory Oversight of PPP Projects During the Operational Phase: A Case Study of the Hangzhou Bay Cross-Sea Bridge
DOI: https://doi.org/10.62517/jmsd.202612404
Author(s)
Yuqing Li
Affiliation(s)
Department of Public Administration, Yanshan University, Qinhuangdao, Hebei, China
Abstract
The Public-Private Partnership (PPP) model plays a significant role in infrastructure provision. Currently, China has gradually shifted from a focus on “construction over operation” to “full life-cycle management,” yet many shortcomings remain in operational phase supervision. Using the Hangzhou Bay Cross-Sea Bridge PPP project as a case study and drawing on international experience, this paper systematically analyzes key issues in the supervision of China’s PPP projects during the operational phase.The study finds that China faces issues such as unreasonable risk-sharing mechanisms, a disconnect between performance evaluation and payment mechanisms, unclear responsibilities among regulatory bodies during the operational phase, a lack of full life-cycle management, and an imperfect legal and institutional framework. By comparing China’s approach with the UK’s PPP regulatory model, this paper proposes countermeasures including establishing a dynamic risk-sharing mechanism, improving a performance-oriented payment system, strengthening full life-cycle supervision, and enhancing the professionalization of regulatory practices. This research holds significant theoretical and practical implications for optimizing the governance of China’s PPP projects.
Keywords
PPP; Operational Phase Supervision; Risk Sharing; Performance Management; Hangzhou Bay Bridge
References
[1] Rybnicek R, Glatz P, Hahn R. Risks in public-private partnerships: A systematic literature review[J]. Public Performance & Management Review, 2020, 43(6): 1413-1444. [2] Jiang W, Yang Q, Jiang J, et al. Operational risk management of PPP infrastructure projects: A bibliometric review[J]. Buildings, 2022, 12(11): 1905. [3] Wang Shouqing, Zhang Shuibo. A Study on Risk-Sharing Mechanisms in PPP Projects [J]. Journal of Tsinghua University (Philosophy and Social Sciences Edition), 2020, 35(4): 120-130. [4] Du J, Wang Y, Li H. Performance evaluation of transport infrastructure PPP projects during the operational phase[J]. Transport Policy, 2023, 132: 12-22. [5] Jokar M R A, Javid R J, Nazari A. Risk assessment for PPP highway projects using fuzzy MCDM[J]. Journal of Construction Engineering and Management, 2021, 147(6): 04021038. [6] Shi L, Li W, He Y. An incentive analysis of the availability payment mechanism in PPP projects[J]. IEEE Access, 2020, 8: 106046-106058. [7] Liu Wei. A Study on Performance Management Issues in PPP Projects [J]. Fiscal Research, 2020(8): 67-78. [8] Grimsey D, Lewis M K. Public-Private Partnerships: The Worldwide Revolution in Infrastructure Provision and Project Finance [M]. Cheltenham: Edward Elgar Publishing, 2004. [9] Yescombe E R. Public-Private Partnerships: Principles of Policy and Finance [M]. 2nd ed. Oxford: Butterworth-Heinemann, 2017. [10] Bao F, Wang H, Skitmore M. Life-cycle analysis of public-private partnership projects: A critical review[J]. Journal of Infrastructure Systems, 2018, 24(4): 04018031. [11] Ke Hong, Wang Shouqing. Research on the Full Life-Cycle Regulatory Mechanism for PPP Projects [J]. Project Management Technology, 2019, 17(6): 5-10. [12] Hodge G A, Greve C. Public-Private Partnerships: An International Performance Review[J]. Public Administration Review, 2007, 67(3): 545-558. [13] Engel E, Fischer R, Galetovic A. The Economics of Public-Private Partnerships: A Basic Guide [J]. Journal of Economic Literature, 2014, 52(2): 377-420. [14] Wen Laicheng, Liu Hongfang, Peng Yu. A Study on Fiscal Risk Supervision in Public-Private Partnerships (PPP)[J]. Journal of Central University of Finance and Economics, 2015(12): 3-8.