Research on Performance Evaluation of Full Process Cost Management in Expressway Projects
DOI: https://doi.org/10.62517/jse.202411307
Author(s)
Junyong Yu
Affiliation(s)
Yunnan Infrastructure Investment Co., Ltd. Kunming, Yunnan, China
Abstract
The research purpose of this article is to optimize the performance evaluation of cost management throughout the entire process of highway projects. Currently, China's highway construction is booming, but cost management is complex and requires the construction of a scientific performance evaluation system to comprehensively supervise and evaluate engineering costs. This article used literature induction method for literature review, followed by expert scoring method to assign scores to indicators, and finally used Analytic Hierarchy Process to determine indicator weights. From the results, this study identified key factors that affect the overall cost management performance of highway projects, and constructed relevant evaluation models and weight hierarchy tables. Therefore, the results of this article are helpful in accurately controlling project costs, evaluating benefits, and optimizing fund management, which is of great significance for improving the level of highway project management and investment return rate.
Keywords
Expressway Project; Full Process Management; Cost Management; Management Performance; Performance Appraisal
References
[1] Deng Feng. Research on Interface Management in the Whole Process Cost Management of Construction Projects. Wuhan: School of Civil Engineering, Wuhan University of Technology, 2007, 3-4 [2] Ke Hong, Zhou Fuyan. Research on the Performance Evaluation Index System of Engineering Cost Management. Highway Transportation Technology, 2012, 29 (12): 48-54 [3] Liu Yan. Research on the Evaluation Method of the Whole Process Cost Control Plan for Highway Construction Projects. Changsha: School of Technology, Economics and Management, Central South University, 2010 [4] Lu Lihong. The Whole Process Cost Management of Cost Consulting Units in Engineering Projects. Science and Technology Information, 2009 (27): 56-58 [5] Peng Haiyan, Li Zhihui. Construction and Evaluation of Maturity Model for Engineering Cost Management. Journal of Chongqing University of Business and Technology (Natural Science Edition), 2012, 29 (6): 57-62 [6] Wang Hun, Liu Chengzhi, Shi Qiongxian. Research on Performance Evaluation of Highway Engineering Cost Management. Logistics Technology, 2012 (10): 115-120 [7] Yang Jing. Performance Evaluation of Highway Cost Management Based on Fuzzy Matter Elements: Changsha: Changsha University of Technology, 2011 [8] Yuan Ping. On the Whole Process Management and Control of Construction Project Cost by Construction Units. Journal of Hunan University of Economics and Management, 2006, 17 (3): 47-48 [9] Zuo Ming (2024). Exploration of Full Process Cost Control and Management Measures for Expressway Projects. Continental Bridge Perspective (02), 128-130 [10] Liu Xinchao (2023). Research on Cost Control Measures for the Whole Process of Expressway Engineering Construction. Transportation World (36), 166-168
Copyright @ 2020-2035 STEMM Institute Press All Rights Reserved